• Description: Abattoir wastewater treatment pond
  • Location: Southland
  • Installed: 2017
  • Project type: Supply and install two 45kW aerators

Two Apex 45kW surface aerators, complete with stainless steel wire rope tethering system, were supplied and installed on a new pond for the treatment of wastewater generated by the abattoir.