• Description: Cidery wastewater treatment plant upgrade
  • Location: Nelson
  • Installed: 2013
  • Project type: Consent, design, build, install and commission

Consents for a new membrane bioreactor (MBR) wastewater treatment plant at Redwood Cider were achieved, allowing for the discharge of treated wastewater to a local stream via a wetland.  The advanced treatment system separates storm water from wastewater, reduces the BOD in the wastewater from 14,000 to less then 50mg/L and can be monitored and operated by Apex Environmental from anywhere in the world with an internet connection.