• Description: Turnkey wastewater treatment plant
  • Location: Temuka, Canterbury
  • Installed: 2017
  • Project type: Design, consent, build & commission

The Temuka Saleyards, one of New Zealand’s busiest, wanted to treat their wastewater onsite rather than incurring the ongoing cost of off-site disposal.  Part of the overall solution was to construct an aerated wastewater treatment pond and install one 7.5kW and one 11kW Apex surface aerators in order to reduce the BOD loading and allow discharge to sewer at off-peak times.