• Description: Tannery wastewater treatment plant upgrade
  • Location: Timaru
  • Project type: Design, build, install and commission

The site wastewater treatment plant was substantially upgraded to ensure the discharge to sewer is compliant with the trade waste consent.  The system is designed to buffer and neutralise the wastewater flows from the tannery using lime slurry and also cope with a high level of fibrous solids in the wastewater.