Wool Scour
Wastewater
Treatment
Winery Wastewater
Upgrade
Winery Wastewater
Upgrade
Winery Wastewater
System
Tannery Wastewater
Upgrade
Winery Wastewater
System

                              

 

 

 

Tannery Wastewater Upgrade

Description:
Location:
Installed:
Project type:
    Tannery wastewater treatment plant upgrade
Timaru
January 2010
Design, build and commission

The system is designed to neutralise and balance the wastewater flows from the tannery to ensure the discharge to sewer is within the consented limits. The system includes a series of sump pumps, a large volume continuously stirred balance tank, a lime make-up tank with dosing system, and a controlled discharge system. Sump pumps are operated by a pump station controller with a conductive level switch assembly, while the balance tank system is controlled from a PLC with user interface enabling a range of process set points to be entered.