Fonterra Wastewater Treatment

Treating wastewater for Fonterra

Apex Water was engaged by Fonterra to design, build and install a wastewater treatment facility to match the standards we all know and love from Fonterra.

The plant was designed and installed in two stages to match the development of a new whole milk powder plant, allowing Fonterra to grow whilst mitigating their effects on the environment. Two Apex DAF units with a joint capacity of up to 260m3 per hour are a feature of the wastewater plant.

Check out our other Food and Beverage Projects

We've designed and built many great projects, which is a testament to the high standards that we adhere to when we do business.